top of page
  • Linkedin
Search

Need Shift Cover? We’ve Got Space Available

  • Writer: MechElecPro Solutions Ltd
    MechElecPro Solutions Ltd
  • Nov 21
  • 3 min read

Updated: 2 days ago

Shift Cover That Keeps Your Plant Running — MechelecPro Solutions

When production stops, every minute costs money. MechelecPro Solutions provides skilled engineering shift cover across industries, from a few hours to long-term placements. We supply qualified maintenance and reliability engineers, facilities technicians, handymen, and labourers to step in at short notice or on planned schedules. We are an engineering company, not an agency — that difference shows in the quality, accountability, and technical depth we bring to every shift.


What We Offer

Flexible cover options tailored to your needs:

Hourly support for short tasks or to assist your team for a few hours.

Short-term cover for planned or unplanned absences, shutdowns, or project peaks.

Long-term placements when you need continuity across multiple shifts or weeks.

Last-minute emergency cover to reduce downtime and get production back on track quickly.

Roles we supply:

Maintenance engineers and reliability engineers;

Facilities technicians and handymen;

Skilled labourers for general site support.

All personnel are selected for relevant technical skills and practical experience so they can contribute from the first shift.


Industries We Support

We work across production-critical sectors and understand their unique demands:

• FMCG and bottling plants;

• Automotive and CNC machining;

• Chemicals and process industries;

• Aerospace;

• Paper and cardboard production.

Our teams are familiar with PLCs, conveyors, packaging lines, process control systems, and the safety regimes these environments require.


Why Choose an Engineering Company Not an Agency

We are not an agency — we are engineers. That distinction matters for operational performance and safety.

Technical competence

Our people are trained engineers and technicians, not general temps. They diagnose root causes, implement robust fixes, and hand over clear technical reports.

Continuity and accountability

We take ownership of the work we do. That means consistent handovers, documented actions, and follow-up recommendations to prevent repeat failures.

Safety and compliance

Our teams work to engineering best practices and site-specific safety procedures, reducing risk and protecting your people and assets.

Cost-effective outcomes

Experienced engineers fix problems faster and more permanently, reducing repeat call-outs and unplanned downtime compared with agency-supplied cover.


How We Work

Rapid matching

We assess the task and match the right skillset to your site and equipment.

Prepared deployment

Engineers arrive with the tools, PPE, and documentation needed to be productive immediately.

Clear reporting

Every shift ends with a concise handover and recommendations to improve reliability and reduce future interruptions.

Flexible commercial terms

We offer transparent pricing for hourly, daily, and longer engagements so you can choose the model that fits your budget and operational needs.


Typical Use Cases

• Emergency breakdowns where you need an experienced engineer on site within hours.

• Planned maintenance peaks when your in-house team needs extra hands for a day or a week.

• Specialist troubleshooting for intermittent faults or complex control-system issues.

• Facilities and site support for non-production tasks that still require technical competence.


What Sets Us Apart

• Engineering-first approach focused on lasting solutions rather than temporary fixes.

• Operational continuity through consistent, accountable personnel.

• Cross-industry experience so we understand the constraints and priorities of your sector.

• Responsive service for last-minute cover without sacrificing quality or safety.


Get Shift Cover Today

Phone: 01788 624762

For urgent cover or to discuss a tailored support plan, contact us and we’ll match the right engineer to your site and get to work. Choose MechelecPro Solutions for technical depth, reliable handovers, and safety-first engineering cover — not just a warm body on shift.

ree

 
 
 

Comments


OFFICE HOURS
ADDRESS

Mon - Fri: 9am - 5pm

​​Saturday: Closed

​Sunday: Closed

Mechelecpro Solutions Ltd
3rd Floor, 86 90 Paul Street
London
England EC2A 4NE

GET IN TOUCH
MechElecPro Solutions

© 2035 by Boost360. Powered and secured by Wix

bottom of page